Menu

common problems

Author: OrePartner Release time: 2025-07-29 13:37:21 View number: 173

1. What is the typical sample size required for mineral processing tests?

A: Sample size varies according to the type of test. 2-5kg is required for exploratory tests, 20-50kg for continuous tests and 500-1000kg for small industrial tests. Exploratory tests require 2-5kg, continuous tests require 20-50kg, and small-scale industrial tests require 500-1000kg, depending on the nature of the ore and the treatment process.

2. How long does it take to complete a complete beneficiation test?

A: Usually it takes 1-2 weeks for exploratory test, 1-2 weeks for continuous test, and 2-4 weeks for industrialized test. The exact time depends on the complexity of the ore and the content of the test.

3. What types of ores can you process?

A: We can process all kinds of metal ores, non-metal ores, tailings, industrial wastes, and complex and difficult to process ores.

4. Can you provide on-site technical service?

A: Yes. We provide a variety of technical service modes such as long-term stationing in the plant, regular inspection and remote support, which can be flexibly arranged according to the needs of customers.

5. How long does it take for a plant transformation project?

A: It usually takes 3-12 months from the inspection to reaching the standard and production. It depends on the scale of transformation, equipment procurement cycle and construction conditions.

6. Will normal production be affected during the transformation period?

A: We will make a detailed construction plan, try to make use of the maintenance period or adopt sectional construction method to minimize the impact on production. If necessary, we can provide temporary production programs.

7. How to ensure that the project meets the expected targets?

A: We ensure technical reliability through strict laboratory tests, semi-industrial tests and detailed engineering design, and send a team of experts to provide on-site guidance during the commissioning stage to ensure that the project meets the standards.

8. How to charge for beneficiation test?

A: See: Beneficiation Services Quotation Details and Order Link.

9. How long is the warranty period after project completion?

A. A 12-month warranty period is normally provided for process performance. During this period, we are responsible for the free optimization of any process design problems that result in non-compliance with the target.

10. Is there any additional charge for subsequent process optimization?

A: There is no charge for optimization adjustment during the warranty period. After the warranty period, we can sign a long-term technical service agreement to provide paid but favorable technical support.

11. Can you provide operator training?

A: Yes. We provide systematic theoretical training and on-site operation guidance, including process principles, equipment operation, fault handling, etc., to ensure that personnel are independent on the job.

12. What should I do if the nature of the ore changes?

A: We will fully study the law of change of ore properties in the initial test, and design the process flow with certain adaptability. At the same time, we will provide long-term technical support and adjust the process parameters in time.

13. What is the general flow of cooperation?

A: The general process is as follows: technical exchanges → signing a contract → sample test → program design → business negotiations → project implementation → acceptance and delivery → after-sales service.

14. How to start cooperation?

A: Please provide the basic information and technical requirements of the ore, we will arrange a professional technical team to dock with you to discuss the specific needs and develop a preliminary work program.

Category
Inquiry and Quotation
Nginx server needs to configure pseudo-static rules, click View configuration method